Stanmore Resources Limited (OTCPK:STMRF) Q4 2023 Results Conference Call February 25, 2024 7:00 PM ET
Company Participants
Marcelo Matos – Chief Executive Officer and Executive Director
Shane Young – Chief Financial Officer
Conference Call Participants
Tom Sartor – Morgans Financial
Brett McKay – Petra Capital
Jim Xu – Barrenjoey
Marcelo Matos
Thank you. Good morning, everyone. Thanks for joining us today for our 2023 Full Year results webcast. I would like to begin today by acknowledging the traditional owners of the land on which we meet the Turrbal and Jagera peoples here in Meanjin, Brisbane. And I also acknowledge the traditional custodians of the lands on which our operations are based, the Barada Barna, the Janga, and the Widi peoples of Central Queensland.
I will begin with a summary of our highlights on Slide number 3. 2023 was another fantastic year for Stanmore and the first full year of ownership of our new SMC assets where our focus has been on embedding these operations into the Stanmore culture and our operating model. Our efforts have translated into impressive results highlighted here, including below average — below industry average safety performance, above guidance saleable production of 13.2 million tonnes and below guidance FOB cash costs across the consolidated group of $86 per tonne. Financial outcome was a full year underlying EBITDA of $1.1 billion, demonstrating the significant earnings capability of our portfolio in a more normalized pricing environment and also supporting a dividend declaration of 8.2 cents US. Together with capital appreciation, Stanmore provided total shareholders return of over 40% for the calendar 2023, significantly above the ASX 300 average and adding to significant returns provided since the last equity raise back in March 2022.
Moving on to the detail for today’s presentation, we will start with a summary of our safety performance on Slide 5. Safety is central to everything we do at Stanmore and is integral to our social license to operate. For previous announcements, we have recently shifted our public reporting to focus on the serious accidents frequency rate or in, of course, serious accidents of over tripper or total recordable injury frequency rate. Why is the tripper remain an important metric, particularly with regard to informing our current efforts to improve lead indicator identifiers? The SAFR provides a direct benchmark to the reported industry averages and is consistent with the latest focus of the Queensland Safety Regulators, and we’ll sharpen our focus on actions and initiatives to prevent the most critical incidents. On that note, we were disappointed to record our first serious accident for 2023, right in the back end of the year in December, contributing to a closing SAFR of 0.90, thus, still well below industry average. We are also conscious of the increase TRIFR over 2023 and aim to provide and to improve our processes, quality of investigations, procedures and understanding of lead indicators to ensure this does not translate into any serious accidents further. And we can endeavor to get this back on the right trajectory with a goal to return our employees safely home to their families.
I’ll move now to the next slide, onto sustainability. We are progressing on our sustainability journey aligned with the expectations of our stakeholders as a pure play met coal company. Sustainability roadmap developed this year relative — or in 2023 provides the direction for ESG for the next five years. On environment, our focus is on our material matters. We have developed our first decarbonization plan and identified various initiatives to contribute to our emissions reductions. The key one that we are busy with, at the moment, it’s our South Walker Creek gas to electricity project with ongoing discussions with two partners, as well as with the Queensland Government. Also, completed a renewable diesel trial as we look to find solutions to reduce diesel emissions while we wait for OEM equipment solutions. We have also [costed] action plans to reduce our reliance on externally sourced water. And we are working on data collection for the upcoming statutory reporting requirements, including of Scope 3 emissions from 2026. In the social space, we developed during 2023 a social performance strategy and action plan, including the development of our community investment framework, which we intend to adopt to assist us in creating lasting value for the communities in which we operate. We continue to deliver on our reconciliation action plan as we look to go from the reflect phase to the innovate phase later this year. Finally, in the governance area, we are focused on the ongoing development of [any penetration] of robust governance management processes to match the size and scale of our business, however, ensuring we maintain our strong culture of an agile and entrepreneurial company.
In Slide 7, in rehab, following from our very strong performance of over 270 hectares of rehabilitated land in 2022, we delivered another 191 in 2023. Our focus is using also production equipment when not required for production to create good rehab outcomes. There is a great photo on the right here of some of our newly rehabilitated land in 2023, showing the contouring of all dragline spoils and truck shovel dumps leveled, contoured, subsoiled, top soiled and seeded to grade effect. The teams are looking to the process of doing our first pilot certifications and we look to implement that in the coming years. On people and community, Slide 8, touching briefly, we remain proud of the positive impact we have on the communities and regions in which we operate. In 2023, our impact to the regions was significant with 507 or 67% of our total employed workforce living and breathing in these communities. Whereas from a procurement perspective, $223 million was spent in these local communities. Contributions to the state government via royalties were AUD835 million, demonstrating the sizable impact of the increased royalty regime introduced from 2022 in Queensland. This figure represents almost 30% of our market cap and over half of our underlying EBITDA in US dollar terms.
Moving to Slide 10, on the metallurgical coal markets. Starting from our product mix, our product mix continues to align with our strategy to be a leading met coal producer with PCI and coking coals comprising 93% of production and over 97% of revenues. Geographical demand trends have proven to be dynamic over the last couple of years with the trade flows adjusting to the Russian sanctions and continued growth in demand from India and Southeast Asia. Stanmore’s customer mix remains stable and focused on traditional markets, such as Japan, Korea and Taiwan. We have seen European demand stay strong at 21% amidst ongoing Russian sanctions, albeit North American volumes have returned to the market with thermal prices reducing back below the metallurgical coal. India and Southeast Asia continue to grow as we will highlight in the coming slides our forecast to the key drivers for growing demand going forward. In Slide 11, we have included a few slides summarizing key trends in steel making and metallurgical coal demand from key research houses such as Wood Mackenzie. As you can see here in Slide 11, world steel production capacity is forecast to continue to grow, increasing by almost 17% through 2020. Obviously, we see a decrease in China of 22%, which to be fair to scale, is quite significant, thus, we still see a net positive growth. And as mentioned in our last slide, the clear drivers for this expansion are India and Southeast Asia, which are projected to more than offset the decreasing output from China.
Slide 12 shows the forecast change in global blast furnace steel production outside of China. Whilst traditional steel making countries are expected to increase output from alternative methods, such as gas base direct iron reduction and electric arc furnace steel making, the expansionary phase in India and Southeast Asia is forecast to be primarily driven by the more competitive and scalable conventional blast furnace steel making rooms. WoodMac has projected total BOF steel making ex-China to increase 23% in the next 10 years and 54% to 2050, whilst India’s share alone is expected to increase almost 200% over the same horizon. Zooming in on the PCI market on Slide 13, which as a reminder, currently comprise around 60% of our production. Demand is projected to steadily increase with India’s share of export demand forecast to increase 3 times to 2050, driven both by India steel making growth but also by the increasing PCI injection rates, which also grows with the maturity of steel making operating practices. PCI remains an important input to conventional steel making, improving costs by reducing the amount of coke required, something which has become increasingly important in light of the current 40% discount of PCI to premium hard coking coal. At these price levels, we also see increasing demand for PCI as a blend filler in coke making, creating a new source of demand and providing some support for prices.
In Slide 14, with Australian exporters set to benefit from growing demand out of India and Southeast Asia, this naturally leads into the conversation of supply we can see here in this slide. Projected growth in demand will require increasing supply for seaborne met coal, of course, especially from Australia. Stanmore’s current operating portfolio and future development is in step with this projections with development opportunities like Lancewood and Eagle Downs providing potential increased exposure to the hard coking coal market. Of course, growth in supply remains subject to sufficient investments supporting the development of new mines, as well as consideration of the logistics network and challenging regulatory environment in Australia. The growth through 2033 out to 2050 above includes WoodMac’s expectations for possible and probable projects. Hence still lots of uncertainty considering all regulatory and funding challenges as well.
On the short term dynamics from Slide 15, which shows the historical price of premium hard coking coal and the discounts to PCI in the area, in the area chart, premium hard coking coal prices have remained strong over the last 12 months with PCI relativity softening from the middle of last year, and remaining soft and well below long term average of around 75 to 80%. Weaker steel market sentiment and compressed margins continue to weigh on demand environment. However, we see the current price and disparity between Australian coking coal grades to be primarily a function of supply. On the PCI side, exports are concentrated to Australia, around one half to two thirds, in Russia, around one third of the market with any significant disruption from either markets impacting prices. Following lower volumes from Russia in 2022, which aided very strong relativities, volumes normalized in 2023 and have increasingly provided competition to Australian exports in key markets, such as India and Southeast Asia, while traditional markets still with ongoing trade sanctions. Nonetheless, in our view, tightness in prime coking coal and supply from Australia will — with many large operations performing at lower levels in the past 12 months has kept the premium coking coal at elevated levels and is the primary driver behind persistently low relativities for lower PCI and semi-soft grades. This trend is clear on Slide 16 showing that 2023 was the lowest annual metallurgical coal export figure in over 10 years with [further] supply interruptions from major producers. Export figures from Queensland port in January 24 show supply is still tight with wet weather holding back and any recovery in supply and distorting prices for premium products in the short term.
Moving on from markets and on to our operations from Slide 18. Total saleable production for the year was 13.2 million tonnes, exceeding the upper end of our guidance by 0.2 million tonnes, and once again demonstrating the output capable from the portfolio in a full year of full ownership of our new asset portfolio. Consolidated FOB cash costs remained steady year-on-year, notwithstanding, continued challenge from inflation and labor whilst our average sales price was $76 per tonne lower year-on-year, following the record highs in 2022. Focusing on each assets and starting with South Walker Creek on Slide 19. It’s been another very strong year with salable production increasing 5% compared to annualized ’22 volumes. CHPP performed exceptionally well, delivering nearly world benchmark operating levels at close to 8,000 hours with zero no coal delays and underpinning the strong production result, and feeding into our strong sales performance with only a steady increase in unit costs. We look forward to how South Walker Creek will continue to deliver in future years with multiple ongoing projects to improve and expand this foundation asset.
On Slide 20, we see that Poitrel also had a robust year, achieving multiple records including drilling meters, explosive tonnes loaded and impressively a mine record for total material [movement]. Whilst the first half was challenged with wet weather early in 2023, catch up of inventory stripping and logistics constraints, we are pleased to report a very solid second half in ’23 with sales volumes increasing almost 50% in the second half. Unit costs were up $9 year-on-year, which is primarily a factor of inflation but also lower yields due to the mining of lower seams with higher ash thermal coal product recoveries as per the previous discussions, but also the fact that coal flow was maximized in second half of 2022 to leverage from the record high price environment and some stripping catching up was required in the first half of 2023. Stockpiles were proactively healthy at the end of 2023 with 900,000 tonnes of ROM providing buffer and derisking the plant for wet weather in parts in early now in 2024. Lastly, at Isaac Plains, on Slide 21, we achieved an all time record for saleable production and sales, supported by healthy opening stockpiles for 2023, maximizing utilization of the recently upgraded CHPP, as well as the washing of some volumes at Poitrel earlier in 2023. Preparations increased as anticipated with the mining sequence continue down seen at Isaac Plains, whilst waste movement at Pit 5 North commenced in the second half ahead of first ROM right in the end of the year in December. Nonetheless, unit cost remained relatively steady year-on-year given the high volumes.
I’ll hand over to Shane now to discuss our financial results.
Shane Young
Thanks, Marcelo. And let’s start with a summary of our key financial performance metrics on Slide 23. It’s important to remember here that all 2022 comparative figures include the SMC assets, South Walker Creek and Poitrel, only from May 2022 onwards, so 2023 is really our first full year of consolidated reporting, including these assets. As always, too, I remind everyone here that all financial figures used are quoted in US dollars, which is Stanmore’s functional currency. Total income was 4% higher year-on-year with the additional four months of SMC sales, which helped overcome a reduction in coal processed in 2023 relative to 2022’s record levels. Costs remains largely steady year-on-year, flowing through to an underlying EBITDA of just over $1.1 billion and operating cash flows of $737 million, which supported significant deleveraging, funding for value accretive organic growth CapEx and $52 million special dividend declared in November, all while transitioning the balance sheet from a net debt to net cash position during the year. Further to the special dividend declared last year by reference to 2022 cash flows, we are again pleased to return cash to shareholders with today’s fully franked dividend of 8.4 US cents per share calculated by reference to 2023 cash flows with our commitment to creating value for shareholders, further demonstrated with total shareholder returns of over 40% in 2023.
Moving on to a more detailed summary of our financial performance on Slide 24. From a P&L perspective, full year underlying EBITDA translated into net profit aftertax of $472 million and EPS of 52.4 US cents per share, reflecting normal course of business earnings. Noting that the 2022 figures were affected by significant once off non-operating adjustments and deferred tax benefits related to the SMC acquisition. Looking at the underlying EBITDA walk forward. As you can see here, the primary driver for lower EBITDA was the normalized price environment following those record high coal prices in 2022, partially offset by the additional four months of production of South Walker Creek and Poitrel. Isaac Plains was slightly lower year-on-year due to anticipated strip ratio increases and non-capitalized overburden and advance removal for the development of Pit 5 North where first run of coal mine was not actually produced until December. Turning now to the dividend determination on Slide 25. As previously highlighted, we are pleased to announce the fully franked final dividend of 8.4 US cents per share following careful consideration of our dividend policy as it applies to our results for 2023, which when taken together with a special dividend of 5.82 US cents per share in November has generated dividend yield of 6.2% in just under four months. Importantly, as the special dividend was effectively determined by way of application of the policy on 2022’s results, today’s announcement demonstrates our 100% commitment to our dividend policy since our equity raise for the SMC acquisition last year, rewarding our shareholders for what has been a very successful few years for Stanmore.
With regards to this dividend calculation specifically, you will notice that we have opted to reserve funds for the upcoming fully accrued BMC acquisition earnout payment, which will be made mid-2023. This represents just a portion of our major cash commitments coming up. And we consider reserving this amount to be prudent to ensure business remains adequately funded to meet future cash requirements, as well as our ongoing CapEx program. On that note, we have provided further detail on our cash position and balance sheet on Slide 26. As you can see on the waterfall, a major achievement in 2023 was transitioning to a net cash position in just under 12 months since the SMC acquisition, overcoming almost $800 million of debt raised at the time of the acquisition in May 2022. Cash generation since that time has been used to solidify balance sheet strength with deleveraging of almost 50% in 2023 and following the debt sweep payment of $77.5 million in early February this year increases our total deleveraging of the acquisition debt facility to $385 million or 62% of the facility since its commencement.
As mentioned on the previous slide, we do have some significant cash flow requirements this year, which have been previously guided to market. They include, a catch up tax payment of between $155 million to $170 million, the SMC earnout, as mentioned earlier, of $150 million and upfront consideration for the 50% Eagle Downs acquisition of $15 million. These commitments are expected to be partially offset by the $136 million in proceeds for the sale of the southern portion of Wards Well, which is expected to complete and therefore be received this year. Before I hand back to Marcelo, Slide 27 includes some additional detail on the breakup of capital expenditure. As you can see here, there are numerous significant capital projects going on, which are largely roughly 60% related to growth and improvement projects. When aligned to our 2023 capital expenditure of $200 million US, the sustaining portion of around 40% sits at that $70 million to $80 million mark for the portfolio. I’ll now hand back to Marcelo to provide a more detailed update of some of these key capital projects from Slide 29.
Marcelo Matos
Thanks Shane. Starting with South Walker Creek, we have a significant pipeline of growth projects, which will strengthen South Walker Creek status as a world class asset. I would also highlight here that the dollars quoted here represent the original budget for each project with the percentage being the amount of that budget spent by the end of 2023. The MRA2C project involving a major creek diversion to open up an area of 58 million tonnes of ROM coal is progressing well with significant infrastructure advancements occurring in 2023 with the completion of the 66KVa powerline relocation, the majority of the required water infrastructure. Importantly, the material movement commenced in August ‘23 is on track with the current plan with project being ahead of schedule and well under budget at this stage. The South Walker Creek CHPP expansion and mine expansion is progressing well with some key achievements of 2023 being the award of the CHPP upgrade contract and the dry hire contracts for the additional three truck and excavator fleets with the mobilization of the first additional fleet well under way. We commenced access to the Y South pit in 2023 with clear and grab in site preparation ahead of the majority of the work expected to occur in 2024, which will enable access to high quality low strip ratio coal during 2024. The last major project we wanted to highlight here for South Walker is the dragline 27 AC upgrade, which will be completed in 2024. This upgrade has been in planning phase since 2022 and in 2023, we were able to complete the factory acceptance testing of the major electrical equipment required for the AC upgrade ahead of the major shutdown and upgrade to starting May this year.
On Slide 30, Poitrel had a very positive 2023 with the progression of the two major projects currently in progress, being the ramp up — the Ramp 10 North development and the Ramp 30 landing. The Ramp 10 box cut is very important for Poitrel’s production profile and for the strip ratio competitiveness. And despite some wet weather challenges early in 2023, project recovered and was able to move over 80% of the planned box cut volumes by the end of 2023. The Ramp 30 levee project is a critical project to enable us to continue mining towards the southern part of the mine and sustain strike length with a large certified flood mitigation structure. The team were able to reach one to 1,000 year flood height in November ’23, well ahead of schedule and under budget. We also commenced revegetation of the levee and disturbed the area prior to the wet season. In relation to our development project on Slide 31, at the end of December, we acquired the remaining 50% in the MetRes joint venture, which owns the Millennium Complex. Millennium concluded conventional open cut activities in 2023 with the operation focused on underground coal mining activities going forward. The achievement of ‘23 for the Mavis underground was the completion of the underground construction and the transition to operations with two continuous minus place change units.
Studies for the Lancewood development project continue to progress with exploration activities commencing after EA amendments, focusing initially on water bores for groundwater modeling, as well as baseline ecology works. The study team completed further optimization of open cut mining operations and refined infrastructure and coal processing optionality. And we intend to conclude the prefeasibility study within this year to be able to make some decisions on how to approach the project, including infrastructure options to support all the regulatory approval submissions.
Lastly, I just wanted to do a quick recap of the deal we signed with South32 for the purchase of 50% in Eagle Downs announced earlier this month on Slide 32, which of course remains subject to completion. This is an asset that has done the rounds over the last decade being on the Enviro’s 50-50 joint venture structures, originally between Vale and Aquila and more recently between South32 and Aquila, which is majority on and controlled by the Chinese giant steel maker, Baowu. For Stanmore, it is a transaction that makes sense and aligns with our strategy, adding a large hard coking coal deposit to our reserve base, providing optionality at low upfront cost. Unlike previous owners, our neighboring assets allow us to auctioneer development pathways, potentially utilizing neighboring infrastructure at Poitrel and Isaac Plains and reducing start up development CapEx and our enlarged revenue contract portfolio via both the [BCT and NEQXT] are also critical enablers for a potential development. The transaction remains subject to the satisfaction of conditions precedent, and we are also in discussions with Aquila to consider the purchase of an additional 30%, which may take us to 80% ownership. As it stands, the asset comes relatively unencumbered from any previous very important take or pay arrangements and have all the regulatory approvals required for startup construction and future operations. We look forward to completing this transaction and bring it into a stage where we understand the development requirements and the potential it can offer to our portfolio in the long-term, including as a growth opportunity but also as a future replacement to the shorter life of mine at Poitrel and Isaac Complex. I’ll now hand briefly back to Shane to close out today’s presentation with our updated 2024 guidance.
Shane Young
Thanks, Marcelo. On Slide 34, we have the updated guidance. Given we provided 2024 guidance as part of the market update and special dividend declaration in November last year, this is really just an incremental update following the acquisition of the remaining 50% of the Millennium Complex, which was previously equity accounted for as an investment rather than fully consolidated into our overall results. As per the table on Slide 34, we are guiding to salable production of between 500,000 to 600,000 tonnes out of the Millennium Complex in 2024, coming from the Mavis Downs underground, which has been ramping up through the back half of 2023. Being an underground operation in the development phase, it’s naturally a higher cost than our open cut portfolio and therefore has a slightly inflationary impact on Stanmore’s consolidated free on board cash cost per tonne with guidance therefore being adjusted to between $99 to $104 per tonne, while CapEx has also been adjusted to include the remaining development activities at Millennium for 2024. This concludes the formal presentation. I’ll now hand back to the operator to commence Q&A.
Question-and-Answer Session
Operator
[Operator Instructions] Your next question comes from Jim Xu from Barrenjoey. Your next question comes from Tom Sartor from Morgans Financial.
Tom Sartor
Just had a couple of questions on the asset deals, you had a busy few months. It looks like the Millennium Complex spent a chunky than expected amount of development capital in ’23. Can you just remind us of the scope of the opportunity there in terms of sustainable annual production, maybe life of the underground? And maybe if, Shane, you can update us on how the debt to the JV from Stanmore was or is being accounted for in the balance sheet please?
Marcelo Matos
I will start maybe with ’23, and probably the easiest way to explain the additional capital is that, I mean that’s — it was mostly working capital. I think the ramp up challenges that we faced just basically required more injection of working capital given that we are not getting the tonnes. So I mean, development — the actual development capital hasn’t been higher than previously anticipated. And hence, that’s still a similar situation now for the first quarter of this year where we are still expecting ramp up volumes to get to the levels we want. You’ve probably seen in our guidance slide that we have derated the amounts for product go in Millennium to around 500,000 to 600,000 this year, that’s basically to reflect the still, let’s say, ongoing ramp up. I think we are probably going to get into more benign conditions soon, both from a geological, I mean, structure or geotech standpoint, but also some water that we faced in the last 45 days ingressing from of all the high wall mining plunges that were mined in that [pit]. I think we’re confident that we should be able to achieve those 0.5 to 0.6 this year, hopefully, increasing slightly from that going forward into 2025 and ‘26. Mavis was always meant to be a short life asset, Tom. And our target is to prove up reserves in the Millennial side of the complex, move the existing equipment into Millennial to be able to extend life. To do that, we require some EA amendments, because there was only open cut mining approvals on the Millennial side. We are busy working on that, as we speak.
Shane Young
Tom, just on the loan between Stanmore and MetRes. I mean, obviously, that now is a 100% owned entity, so it eliminates on consolidation by previous and immediately prior to the acquisition, we did need to assess the fair value for accounting purposes of that loan. So you may notice in the accounts that there was a provision set aside for potential credit losses on that just based on where coal prices are at long term from some of the research houses. So for accounting purposes, we had to provide around 18 million against that loan for that purpose. But now that it’s 100% owned it fully eliminates on consolidation and we’ll continue to support that asset based on where we see the future for Millennium going forward.
Tom Sartor
And just a reminder, it’s a prime hard product, more or less from the underground there, and it gets close to a hundred percent realization. Is that right?
Marcelo Matos
Not really, I think, it’s at — we have around 60% as a low vol hard coking company, but it’s not prime hard, Tom. The Mavis coking coal has been marketed for many years right back in the days, and it was always attracting 100% of the tier two low vol index, not the prime one. And the balance, which is around 35% to 40% is a 20 VM PCI.
Tom Sartor
And just quickly on Eagle Downs, appreciate it’s a longer dated option. Just curious about what drilling and/or evaluation expenditure you might want or need to spend there over the next few years, or is it too early to say?
Marcelo Matos
The project’s being extremely, let’s say, studied and the results are extremely well defined. It’s been a lot of exploration from all angles possible from drilling to coal, I mean, coal quality, structure, seismic and gas. So it’s very well defined. Two, very robust bankable feasibility studies done by the owners in the past, the 40% built access drift. So we don’t expect that any significant amount of that acquisition is required. What we are looking now is really to do optimization studies to see what’s the entry capital to get the project started. Of course, starting with drift development, getting to coal and of course, lower mining ventilation and all the infrastructure required. Our aim is to minimize startup capital. But as I said before, I think, first we need to get the acquisition completed and let’s say the final format of the joint venture aligned with the joint venture partner. I think it aligns well with our strategy, it’s next door to our assets, the hard coking coal asset that has all the approvals in place, it’s a potential long term replacement for Poitrel and Isaac Plains, and puts us into the high coking coal space and adds another billion tonnes of resource to our portfolio. Three years ago, we were a company with 20 million tonnes of reserves ahead of us. I think we are now in a very privileged position if you complete this deal to have 4 billion tonnes of resources with multiple options to choose from.
Operator
Your next question comes from Brett McKay from Petra Capital.
Brett McKay
Just on the growth options going forward. When do you expect you’ll be in a position to, I guess, clarify what the optimal approach is to the optionality in the portfolio now? I know that Eagle Downs hasn’t been — hasn’t closed yet, but just in terms of a longer dated timeline. If you could provide a little bit of guidance around when we may find out a bit more about Lancewood? Obviously, you’re doing a pre phase there this year at Eagle Downs, you’ve still got Isaac Plains underground in the portfolio. So you do have lots of optionality now in the portfolio. But can you give us a bit of a feel for when we would know exactly how you’re going to approach all these options and then understand how not only the capital is spent but also the production profile how it might develop over time?
Marcelo Matos
I think it’s quite relevant and I expect that that’s important information. I think there’s a bit of work we still need to do to be able to provide better visibility. What I can say is Lancewood is a project that we will need to go through its own, let’s say, the full regulatory approvals. Our conclusions to date is, if we stay under the 2 million tonne run of mine per annum, which is the threshold for us not to require an EIS in Queensland, it doesn’t seem to be economic, it’s quite a large box cut, it’s a very compact pit and we start at more than 9:1 strip ratio compared to Isaac Downs where we were at 3:4:1 to start. So it’s quite a large box cut, which will require more capital and at a scale to be justifiable that’s going to be probably above that 2 million tonne run threshold. That means that we will need to go through a full EIS and its own, let’s say, environmental approvals. So I don’t think we would be seeing start of construction unless we would in less than three years, for example. And that provides a bit of visibility, because in Eagle Downs, for example, conversely is ready to go, it has all the approvals in place. It’s a question now of us understanding the attractiveness of the project, how low we can bring the CapEx to be able to get started and how staggered is the investment until we get your first call, right, because we’re going to have to do drift development, development on the ground to get to a longwall box developed and ready to be mined.
Fortunately, there is a lot of degassing that was done in Lancewood — in Eagle Downs. So I mean, we believe that we may be able to start mining a lot ahead that we would otherwise if we needed to get to start gas drainage from scratch. So I think we need a bit of time, Brett. But I think we may find that there is probably a way for us to stagger these investments given Lancewood will, I mean, inevitably will take another at least three years until we are able to start disturbing ground, until we have approvals. And Eagle Downs, likewise, is not a project that’s going to be built in a year and half or two years. It’s a large development and we should be able to spread it well. But again focus now is it completed the transaction, doing the work to be able to get to that point. So I hope to be able to provide that visibility sometime in the second half this year to the market about what we can expect in terms of timing, in terms of general options for Lancewood. And obviously, subject to us completing Eagle Downs, get to a point towards the end of the year where we know what the project can be for us and we may be able to start taking some decisions soon.
Brett McKay
Just quickly, can you provide us an update on the weather events that you had earlier in the year? Clearly, that was a topic of conversation on the quarterly call. Just looking at what’s happened since then, it doesn’t look like it’s been overly wet. Do you feel like there’s potential for you to catch up any of those lost tonnages that we spoke about a month or so ago?
Marcelo Matos
I think catching up is already happening, as we speak. So you are right, I think it hasn’t been too wet recently. January and first half of February were quite difficult. Poitrel is very well set up, as I said earlier, since late last year we brought a lot of coal forward, we had a lot of raw inventories, which will help a lot. We had shipped around 800,000 tonnes in January. February, it’s looking really strong, which will be. We will have caught up quite a lot in February already from the lower January, both from sales but also on production. I think by the end of Q1, we should be back to where we wanted to be as part of the plan or the budget for this year.
Brett McKay
And just lastly, on the dividend, just noting that you pulled out the 150 million that you need to pay for BMC. On an ongoing sort of forward-looking basis, is that something that the company will continue to do is to sort of ex out big chunks of — or not even big, modest chunks of expected outgoings from that dividend pool? Just trying to understand the Board’s decision around those upcoming payments, especially considering the growth profile of the company and how it will evolve over the next sort of 12 to 24 months? Just trying to get a read on how the dividend outlook will morph or evolve over that time?
Shane Young
Brett, not sure this one. So it was a bit of a unique situation with the BMC earnout and that it was a confirmed committed payment that related to a past transaction that we do have other cash commitments coming up in 2024, as mentioned on the call, around large tax payment expected in midyear and some other payments as well. But we thought that this one was more unique in the sense that it did relate to a past transaction and it was known and committed to at the time of making a dividend declaration. So I don’t expect this to be something that’s really repeated on an ongoing basis beyond the cash flow sweep adjustment that we make each year, which as you know, is connected directly to cash flows generated from the prior year. And I’d also probably point out that it is timing in nature. For example, when we — if we’re to sit down at this time next year and have a look at this calculation again, because we have reserved or preserved this 150 million from the dividend decision for 2023, we’ll have to adjust that back for when we look at cash flows that were generated in 2024. So it’s really just about timing of maintaining adequate cash and liquidity for those big ones off sort of chunky items, which we don’t expect to see too many of going forward.
Operator
Your next question comes from Jim Xu from Barrenjoey.
Jim Xu
So maybe just follow up on the balance sheet. So understand your acquisition debt facility is non-callable up until May of this year, given it’s got fairly restrictive cash sweeps in that facility. Are you looking to refinance it and how advanced are those discussions? And then further on just to that, if you do refinance it and it becomes kind of interest only payments, how will you provision for the debt repayments when you think about your dividend?
Shane Young
So the acquisition financing, as you pointed out, can be repaid at par value following a two year anniversary, which is the 3rd of May this year. So we are free to refinance at any time. But if we do it after the 3rd of May, it’ll be at par. So it is something that we have been considering. I think I’ve maybe mentioned that a couple of occasion previously as well. It just gives us a good opportunity to have a look at the market and consider, I guess, our optimal debt structure and more normalized debt facilities as well for the whole company as a corporate. So to that end, it is something that we are considering moving forward with in the first half of this year and doing some planning for that, as we speak. In terms of how that looks like and what that looks like going forward, that’s really something that will sort of play out through that work. I think the objective for us is to have facilities that are normalized for the size of company that we are now. And also looking for improvements on where that pricing is coming as well given the change in our credit profile and risk profile as an organization. So they’re probably the two keys together with allowing the capacity to consider future growth if we wanted to start to develop some of our organic growth platforms or otherwise.
Marcelo Matos
Maybe just to add to that, Jim. It’s reasonable to assume that this restrictive sweeps that we have as part of the acquisition facility wouldn’t be something that we would be looking to add as part of a more normal, let’s say, refi structure. Having said that, depending on the structure, we may not necessarily see only interest only type of structures. We may see some more normal amortizing profile as well depending on the, let’s say, on the structure of the overall facility and the profile of the lending group. So I think that’s work. There’s a lot of work happening as we speak, as Shane said. And yes, we look forward to update you guys when we have a bit more and more progress.
Jim Xu
Maybe just a follow-up question on safety. Your SAFR is still well below industry averages, but both SAFR and TRIFR have increased over the past year. Has there been a main driver of the increase in the TRIFR, anything that the management team would like to focus on in particular?
Marcelo Matos
Jim, I normally would like to talk to [indiscernible] as a rabid dog. You’ll keep your foot on its neck, otherwise it grows and bites you. So you can have a take the foot off and I don’t think there’s any fundamental structural issue. I think the culture is good, it’s positive, the systems are in place. And we were working at a TRIFR level of 1.5% is extremely low. So it’s not very unusual for you to see some of those recurrences happening. And I think what you need to do when they happen is understand the drivers, the lead indicators. And that’s what we are working hard on, is to make sure that we focus on leading initiatives to be able to see them coming. And as I said, the focus on SAFR going forward is really to prevent the serious one, those are the ones that we really need to be on top of that we cannot afford them happening, okay. I think as I said, a lot of work, good work going into that. And I hope to see those trends reversing soon.
Jim Xu
And if I can just sneak one more in, really quick one. Just wanted to confirm, with the Eagle Downs acquisition, are there any take or pay liabilities associated with that, or have they been all held at the equivalent level and cleared by them?
Marcelo Matos
No [Ravenport] take or pay. There are some existing commitments for power infrastructure. This was a part of the implementation of the transmission lines and the power infrastructures available to the project. There is no power supply but it’s not a long term payment of infrastructure. And water supply is around just above 600 megaliters of raw water as a contract which is fundamental for the project. I don’t think in terms of carrying costs for the project, they are significant. And we also want to be talking to the JV partner, because even on our existing business, we should be able to absorb some of the, for example, water requirements given that we also have a lot of reliance on the Brae side oilfield to South Walker and Poitrel. And so again, water, power and minimal sites can be [maintained] at the moment, as we speak, that’s all.
Jim Xu
And so are you able to give any guide on the size of the carry cost of the project?
Marcelo Matos
At the moment, between AUS12 million, AUS14 million per year, that’s the basic carrying cost at the moment, as we speak, and a 100% basis.
Operator
There are no further questions at this time. I’ll now hand back to Mr. Matos for closing remarks.
Marcelo Matos
Well, thanks everyone for the questions. It’s been a privilege to present such a fantastic result today. I would like to take the opportunity to thank our employees and our major contractors. Last two years has certainly been a dynamic period. And at the end of the day, it’s our employees who will show up each day to underpin our business and its successes. So of course, I would like to thank our major shareholders that have been with us through this journey and continue to show their support for the fundamentals of our business. We look forward to engaging with all of you in the coming days. Thanks everyone for your time. Have a good day.